On the performance of VSI Shewhart control chart for monitoring the coefficient of variation in the presence of measurement errors
In this paper, we propose a variable sampling interval Shewhart control chart to monitor the coefficient of variation (CV) squared, denoted by VSI SH- γ 2 . The new model overcomes the ARL-biased (average run length) property of the control chart monitoring the CV in a previous study by designing tw...
Saved in:
Published in | International journal of advanced manufacturing technology Vol. 104; no. 1-4; pp. 211 - 243 |
---|---|
Main Authors | , , , |
Format | Journal Article |
Language | English |
Published |
London
Springer London
01.09.2019
Springer Nature B.V Springer Verlag |
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | In this paper, we propose a variable sampling interval Shewhart control chart to monitor the coefficient of variation (CV) squared, denoted by VSI SH-
γ
2
. The new model overcomes the ARL-biased (average run length) property of the control chart monitoring the CV in a previous study by designing two one-sided charts rather than one two-sided chart. Moreover, the effect of measurement error on the performance of the VSI SH-
γ
2
control chart is investigated. The incorrect formula for the distribution of the CV in the presence of measurement error in a former study is fixed. Numerical simulations show that the precision errors and accuracy errors do have negative influences on the VSI SH-
γ
2
chart. An appropriate strategy based on the obtained results is suggested to reduce these negative effects. |
---|---|
ISSN: | 0268-3768 1433-3015 |
DOI: | 10.1007/s00170-019-03352-7 |