Conditions and costs for renewables electricity grid connection: Examples in Europe

This paper compares conditions and costs for RES-E grid connection in selected European countries. These are Germany, the Netherlands, the United Kingdom, Sweden, Austria, Lithuania and Slovenia. Country specific case studies are presented for wind onshore and offshore, biomass and photovoltaic powe...

Full description

Saved in:
Bibliographic Details
Published inRenewable energy Vol. 33; no. 8; pp. 1832 - 1842
Main Authors Swider, Derk J., Beurskens, Luuk, Davidson, Sarah, Twidell, John, Pyrko, Jurek, Prüggler, Wolfgang, Auer, Hans, Vertin, Katarina, Skema, Romualdas
Format Journal Article
LanguageEnglish
Published Oxford Elsevier Ltd 01.08.2008
Elsevier Science
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:This paper compares conditions and costs for RES-E grid connection in selected European countries. These are Germany, the Netherlands, the United Kingdom, Sweden, Austria, Lithuania and Slovenia. Country specific case studies are presented for wind onshore and offshore, biomass and photovoltaic power systems, as based on literature reviews and stakeholder interviews. It is shown that, especially for wind offshore, the allocation of grid connection costs can form a significant barrier for the installation of new RES-E generation if the developer has to bear all such costs. If energy policy makers want to reduce the barriers for new large-scale RES-E deployment, then it is concluded that the grid connection costs should be covered by the respective grid operator. These costs may then be recouped by increasing consumer tariffs for the use of the grid.
Bibliography:ObjectType-Article-2
SourceType-Scholarly Journals-1
ObjectType-Feature-1
content type line 23
ISSN:0960-1481
1879-0682
DOI:10.1016/j.renene.2007.11.005