Revenue Risk Modelling and Assessment on BOT Highway Project

The infrastructure project which is considered as a public-private partnership approach under BOT (Build-Operate-Transfer) arrangement, such as a highway, is risky. Therefore, assessment on risk factors is essential as the project have a concession period and is influenced by macroeconomic factors a...

Full description

Saved in:
Bibliographic Details
Published inJournal of physics. Conference series Vol. 953; no. 1; pp. 12145 - 12149
Main Authors Novianti, T, Setyawan, H Y
Format Journal Article
LanguageEnglish
Published Bristol IOP Publishing 01.01.2018
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The infrastructure project which is considered as a public-private partnership approach under BOT (Build-Operate-Transfer) arrangement, such as a highway, is risky. Therefore, assessment on risk factors is essential as the project have a concession period and is influenced by macroeconomic factors and consensus period. In this study, pre-construction risks of a highway were examined by using a Delphi method to create a space for offline expert discussions; a fault tree analysis to map intuition of experts and to create a model from the underlying risk events; a fuzzy logic to interpret the linguistic data of risk models. The loss of revenue for risk tariff, traffic volume, force majeure, and income were then measured. The results showed that the loss of revenue caused by the risk tariff was 10.5% of the normal total revenue. The loss of revenue caused by the risk of traffic volume was 21.0% of total revenue. The loss of revenue caused by the force majeure was 12.2% of the normal income. The loss of income caused by the non-revenue events was 6.9% of the normal revenue. It was also found that the volume of traffic was the major risk of a highway project because it related to customer preferences.
ISSN:1742-6588
1742-6596
DOI:10.1088/1742-6596/953/1/012145