ITER tungsten divertor design development and qualification program

•Detailed design development plan for the ITER tungsten divertor.•Latest status of the ITER tungsten divertor design.•Brief overview of qualification program for the ITER tungsten divertor and status of R&D activity. In November 2011, the ITER Council has endorsed the recommendation that a perio...

Full description

Saved in:
Bibliographic Details
Published inFusion engineering and design Vol. 88; no. 9-10; pp. 1798 - 1801
Main Authors Hirai, T., Escourbiac, F., Carpentier-Chouchana, S., Fedosov, A., Ferrand, L., Jokinen, T., Komarov, V., Kukushkin, A., Merola, M., Mitteau, R., Pitts, R.A., Shu, W., Sugihara, M., Riccardi, B., Suzuki, S., Villari, R.
Format Journal Article
LanguageEnglish
Published Elsevier B.V 01.10.2013
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:•Detailed design development plan for the ITER tungsten divertor.•Latest status of the ITER tungsten divertor design.•Brief overview of qualification program for the ITER tungsten divertor and status of R&D activity. In November 2011, the ITER Council has endorsed the recommendation that a period of up to 2 years be set to develop a full-tungsten divertor design and accelerate technology qualification in view of a possible decision to start operation with a divertor having a full-tungsten plasma-facing surface. To ensure a solid foundation for such a decision, a full tungsten divertor design, together with a demonstration of the necessary high performance tungsten monoblock technology should be completed within the required timescale. The status of both the design and technology R&D activity is summarized in this paper.
Bibliography:ObjectType-Article-2
SourceType-Scholarly Journals-1
ObjectType-Feature-1
content type line 23
ObjectType-Article-1
ObjectType-Feature-2
ISSN:0920-3796
1873-7196
DOI:10.1016/j.fusengdes.2013.05.010