Fast identifying redundant security constraints in SCUC in the presence of uncertainties
Security constrained unit commitment (SCUC), with renewable resources integrated into power grid, is one core function in the day-ahead market. However, it confronts with critical challenges as the heavy complicated security constraints are considered. Usually, it is observed that lots of security c...
Saved in:
Published in | IET generation, transmission & distribution Vol. 14; no. 13; pp. 2441 - 2449 |
---|---|
Main Authors | , , , , , , |
Format | Journal Article |
Language | English |
Published |
The Institution of Engineering and Technology
03.07.2020
Wiley |
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | Security constrained unit commitment (SCUC), with renewable resources integrated into power grid, is one core function in the day-ahead market. However, it confronts with critical challenges as the heavy complicated security constraints are considered. Usually, it is observed that lots of security constraints are redundant, which can be identified and eliminated, so as to reduce the computational complexity. In this study, the authors first lift the uncertain feasible region of SCUC into a high dimensional space. Furthermore, a fast identification method is proposed to relax the original feasible region, which thus can be solved by the classical greedy algorithm. In order to prevent the over-relaxation and find more redundant constraints, an efficient feasible-based bound tightening strategy is utilised to provide a tighter bound. Numerical results on large-scale test systems verify the effectiveness of the proposed method. |
---|---|
ISSN: | 1751-8687 1751-8695 |
DOI: | 10.1049/iet-gtd.2019.1275 |