Rescheduling for New Orders

This paper considers scheduling problems where a set of original jobs has already been scheduled to minimize some cost objective, when a new set of jobs arrives and creates a disruption. The decision maker needs to insert the new jobs into the existing schedule without excessively disrupting it. Two...

Full description

Saved in:
Bibliographic Details
Published inOperations research Vol. 52; no. 3; pp. 440 - 453
Main Authors Hall, Nicholas G, Potts, Chris N
Format Journal Article
LanguageEnglish
Published Linthicum INFORMS 01.05.2004
Institute for Operations Research and the Management Sciences
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:This paper considers scheduling problems where a set of original jobs has already been scheduled to minimize some cost objective, when a new set of jobs arrives and creates a disruption. The decision maker needs to insert the new jobs into the existing schedule without excessively disrupting it. Two classes of models are considered. First, we minimize the scheduling cost of all the jobs, subject to a limit on the disruption caused to the original schedule, where this disruption is measured in various ways. In the second class, a total cost objective, which includes both the original cost measure and the cost of disruption, is minimized. For both classes and various costs based on classical scheduling objectives, and for almost all problems, we provide either an efficient algorithm or a proof that such an algorithm is unlikely to exist. We also show how to extend both classes of models to deal with multiple disruptions in the form of repeated arrivals of new jobs. Our work refocuses the extensive literature on scheduling problems towards issues of rescheduling, which are important because of the frequency with which disruptions occur in manufacturing practice.
Bibliography:SourceType-Scholarly Journals-1
ObjectType-Feature-1
content type line 14
ISSN:0030-364X
1526-5463
DOI:10.1287/opre.1030.0101