Scheduling deteriorating jobs subject to job or machine availability constraints
We consider two problems of scheduling a set of independent, non-preemptable and proportionally deteriorating jobs on a single machine. In the first problem, the machine is not continuously available for processing but the number of non-availability periods, the start time and end time of each perio...
Saved in:
Published in | European journal of operational research Vol. 180; no. 1; pp. 472 - 478 |
---|---|
Main Author | |
Format | Journal Article |
Language | English |
Published |
Amsterdam
Elsevier B.V
01.07.2007
Elsevier Elsevier Sequoia S.A |
Series | European Journal of Operational Research |
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | We consider two problems of scheduling a set of independent, non-preemptable and proportionally deteriorating jobs on a single machine. In the first problem, the machine is not continuously available for processing but the number of non-availability periods, the start time and end time of each period are known in advance. In the second problem, the machine is available all the time but for each job a ready time and a deadline are defined. In both problems the criterion of schedule optimality is the maximum completion time. We show that the decision version of the first (the second) problem is NP-complete in the ordinary or in the strong sense, depending on the number of non-availability periods (the number of ready times and deadlines). |
---|---|
Bibliography: | SourceType-Scholarly Journals-1 ObjectType-Feature-1 content type line 14 |
ISSN: | 0377-2217 1872-6860 |
DOI: | 10.1016/j.ejor.2006.04.021 |