A study on M/G/1 feedback retrial queue with subject to server breakdown and repair under multiple working vacation policy

In this paper, we consider a single server feedback retrial queueing system with multiple working vacations and vacation interruption. An arriving customer may balk the system at some particular times. As soon as orbit becomes empty at regular service completion instant, the server goes for a workin...

Full description

Saved in:
Bibliographic Details
Published inAlexandria engineering journal Vol. 57; no. 2; pp. 947 - 962
Main Authors Rajadurai, P., Saravanarajan, M.C., Chandrasekaran, V.M.
Format Journal Article
LanguageEnglish
Published Elsevier 01.06.2018
Online AccessGet full text
ISSN1110-0168
DOI10.1016/j.aej.2017.01.002

Cover

Loading…
More Information
Summary:In this paper, we consider a single server feedback retrial queueing system with multiple working vacations and vacation interruption. An arriving customer may balk the system at some particular times. As soon as orbit becomes empty at regular service completion instant, the server goes for a working vacation. The server works at a lower service rate during working vacation (WV) period. After completion of regular service, the unsatisfied customer may rejoin into the orbit to get another service as feedback customer. The normal busy server may get to breakdown and the service channel will fail for a short interval of time. The steady state probability generating function for the system size is obtained by using the supplementary variable method. Some important system performance measures are obtained. Finally, some numerical examples and cost optimization analysis are presented. Keywords: Retrial queues, Feedback, Working vacation, Balking, Server breakdown
ISSN:1110-0168
DOI:10.1016/j.aej.2017.01.002