Impact of the Three Gorges Dam on the spawning stock and natural reproduction of Chinese sturgeon in the Changjiang River, China

Chinese sturgeon (Acipenser sinensis) is the flagship species of the Changjiang River. The migration route of this species is blocked by the first dam, the Gezhou Dam, and its reproduction is affected by the Three Gorges Dam (TGD), one of the largest dams in the world. We studied the impact of the i...

Full description

Saved in:
Bibliographic Details
Published inChinese journal of oceanology and limnology Vol. 34; no. 5; pp. 894 - 901
Main Author 高欣 林鹏程 黎明政 段中华 刘焕章
Format Journal Article
LanguageEnglish
Published Heidelberg Science Press 01.09.2016
Springer Nature B.V
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:Chinese sturgeon (Acipenser sinensis) is the flagship species of the Changjiang River. The migration route of this species is blocked by the first dam, the Gezhou Dam, and its reproduction is affected by the Three Gorges Dam (TGD), one of the largest dams in the world. We studied the impact of the impoundment of the Three Gorges Reservoir (TGR) since 2003 on the spawning stock and the natural reproduction of the Chinese sturgeon by using our monitoring data from 1997 to 2013. Results indicate that TGR impoundment has delayed the first spawning dates of the fish from middle-late October to late November, decreased the amount of spawning activities from twice to only once each year, and significantly reduced egg production. In particular, the fish did not demonstrate any spawning activities in 2013. Therefore, TGR impoundment significantly affects the natural reproduction of the fish downstream of the TGD. The spawning stock size of the fish is also predicted to further decrease in the future, which will lead to a risk of population extinction. Ecological regulations must be imposed on decreasing the water temperature to 20℃ before mid-October and increasing water discharge downstream of the TGD in October to induce spawning of the Chinese sturgeon.
Bibliography:Chinese sturgeon; Three Gorges Dam; spawning activity; spawning stock; conservation
Chinese sturgeon (Acipenser sinensis) is the flagship species of the Changjiang River. The migration route of this species is blocked by the first dam, the Gezhou Dam, and its reproduction is affected by the Three Gorges Dam (TGD), one of the largest dams in the world. We studied the impact of the impoundment of the Three Gorges Reservoir (TGR) since 2003 on the spawning stock and the natural reproduction of the Chinese sturgeon by using our monitoring data from 1997 to 2013. Results indicate that TGR impoundment has delayed the first spawning dates of the fish from middle-late October to late November, decreased the amount of spawning activities from twice to only once each year, and significantly reduced egg production. In particular, the fish did not demonstrate any spawning activities in 2013. Therefore, TGR impoundment significantly affects the natural reproduction of the fish downstream of the TGD. The spawning stock size of the fish is also predicted to further decrease in the future, which will lead to a risk of population extinction. Ecological regulations must be imposed on decreasing the water temperature to 20℃ before mid-October and increasing water discharge downstream of the TGD in October to induce spawning of the Chinese sturgeon.
GAO Xi, LIN Pengcheng , LI Mingzheng, DUAN Zhonghua, LIU Huanzhang( 1 Institute of Hydrobiology, Chinese Academy of Sciences, Wuhan 430072, China ;2 Key Laboratory of Aquatic Biodiversity and Conservation of Chinese Academy of Sciences, Chinese Academy of Sciences Wuhan 430072, China)
37-1150/P
ObjectType-Article-1
SourceType-Scholarly Journals-1
ObjectType-Feature-2
content type line 14
content type line 23
ISSN:0254-4059
2096-5508
1993-5005
2523-3521
DOI:10.1007/s00343-016-5027-z