Production and transport scheduling in flexible job shop manufacturing systems

This paper addresses an extension of the flexible job shop scheduling problem by considering that jobs need to be moved around the shop-floor by a set of vehicles. Thus, this problem involves assigning each production operation to one of the alternative machines, finding the sequence of operations f...

Full description

Saved in:
Bibliographic Details
Published inJournal of global optimization Vol. 79; no. 2; pp. 463 - 502
Main Authors Homayouni, Seyed Mahdi, Fontes, Dalila B. M. M.
Format Journal Article
LanguageEnglish
Published New York Springer US 01.02.2021
Springer
Springer Nature B.V
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:This paper addresses an extension of the flexible job shop scheduling problem by considering that jobs need to be moved around the shop-floor by a set of vehicles. Thus, this problem involves assigning each production operation to one of the alternative machines, finding the sequence of operations for each machine, assigning each transport task to one of the vehicles, and finding the sequence of transport tasks for each vehicle, simultaneously. Transportation is usually neglected in the literature and when considered, an unlimited number of vehicles is, typically, assumed. Here, we propose the first mixed integer linear programming model for this problem and show its efficiency at solving small-sized instances to optimality. In addition, and due to the NP-hard nature of the problem, we propose a local search based heuristic that the computational experiments show to be effective, efficient, and robust.
Bibliography:ObjectType-Article-1
SourceType-Scholarly Journals-1
ObjectType-Feature-2
content type line 14
ISSN:0925-5001
1573-2916
DOI:10.1007/s10898-021-00992-6