Maintenance scheduling and production control of multiple-machine manufacturing systems

This paper deals with the production and preventive maintenance control problem for a multiple-machine manufacturing system. The objective of such a problem is to find the production and preventive maintenance rates for the machines so as to minimize the total cost of inventory/backlog, repair and p...

Full description

Saved in:
Bibliographic Details
Published inComputers & industrial engineering Vol. 48; no. 4; pp. 693 - 707
Main Authors Gharbi, A., Kenné, J.-P.
Format Journal Article
LanguageEnglish
Published New York Elsevier Ltd 01.06.2005
Pergamon Press Inc
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:This paper deals with the production and preventive maintenance control problem for a multiple-machine manufacturing system. The objective of such a problem is to find the production and preventive maintenance rates for the machines so as to minimize the total cost of inventory/backlog, repair and preventive maintenance. A two-level hierarchical control model is presented, and the structure of the control policy for both identical and non-identical manufacturing systems is described using parameters, referred to here as input factors. By combining analytical formalism with simulation-based statistical tools such as experimental design and response surface methodology, an approximation of the optimal control policies and values of input factors are determined. The results obtained extend those available in existing literature to cover non-identical machine manufacturing systems. A numerical example and a sensitivity analysis are presented in order to illustrate the robustness of the proposed approach. The extension of the proposed production and preventive maintenance policies to cover large systems (multiple machines, multiple products) is discussed.
Bibliography:ObjectType-Article-2
SourceType-Scholarly Journals-1
ObjectType-Feature-1
content type line 23
ISSN:0360-8352
1879-0550
DOI:10.1016/j.cie.2004.12.007