Performance History and Upgrades for the DIII-D Gyrotron Complex
The gyrotron installation on the DIII-D tokamak has been in operation at the second harmonic of the electron cyclotron resonance since the mid-1990s. Prior to that a large installation of ten 60 GHz tubes was operated at the fundamental resonance. The system has been upgraded regularly and is an eve...
Saved in:
Published in | EPJ Web of Conferences Vol. 87; pp. 2009 - 1-02009-4 |
---|---|
Main Authors | , , , , , , , , , , , , |
Format | Journal Article Conference Proceeding |
Language | English |
Published |
Les Ulis
EDP Sciences
01.01.2015
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The gyrotron installation on the DIII-D tokamak has been in operation at the second harmonic of the electron cyclotron resonance since the mid-1990s. Prior to that a large installation of ten 60 GHz tubes was operated at the fundamental resonance. The system has been upgraded regularly and is an everyday tool for experiments on DIII-D. |
---|---|
Bibliography: | ObjectType-Article-1 SourceType-Scholarly Journals-1 ObjectType-Feature-2 content type line 23 AC02-09CH11466 USDOE |
ISSN: | 2100-014X 2101-6275 2100-014X |
DOI: | 10.1051/epjconf/20158702009 |