Multivariate coefficient of variation control charts in phase I of SPC

Multivariate control charts are mostly available for monitoring the process mean vector or the covariance matrix. Recently, work has been done on monitoring the multivariate coefficient of variation (CV) in phase II of the statistical process control (SPC). However, no study has investigated the per...

Full description

Saved in:
Bibliographic Details
Published inInternational journal of advanced manufacturing technology Vol. 99; no. 5-8; pp. 1903 - 1916
Main Authors Abbasi, Saddam Akber, Adegoke, Nurudeen A.
Format Journal Article
LanguageEnglish
Published London Springer London 01.11.2018
Springer Nature B.V
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:Multivariate control charts are mostly available for monitoring the process mean vector or the covariance matrix. Recently, work has been done on monitoring the multivariate coefficient of variation (CV) in phase II of the statistical process control (SPC). However, no study has investigated the performance of the multivariate CV charts in phase I. The phase I procedures are more important and involve the estimation of the charts’ limits from a historical or reference dataset that represents the in-control state of the process. In real life, contaminations are mostly present in the historical samples; hence, the phase I procedures are mostly adopted to get rid of these contaminated samples. In this study, we investigate the performance of a variety of multivariate CV charts in phase I considering both diffuse symmetric and localized CV disturbance scenarios, using probability to signal as a performance measure. A real-life application, concerning carbon fiber tubing, is also provided to show the implementation of the proposed charts in phase I. The findings of this study will be useful for practitioners in their selection of an efficient phase I control chart for monitoring multivariate CV.
ISSN:0268-3768
1433-3015
DOI:10.1007/s00170-018-2535-3