An agile operations management system for green factory
The globalization of suppliers and personalization of customers require new manufacturing strategy for environmental issues, region’s special regulation and energy besides manufacturing factors from manufacturers. In this study, green factory is defined as a manufacturing floor that reduces waste el...
Saved in:
Published in | International Journal of Precision Engineering and Manufacturing-Green Technology, 1(2) Vol. 1; no. 2; pp. 131 - 143 |
---|---|
Main Authors | , , |
Format | Journal Article |
Language | English |
Published |
Springer
Korean Society for Precision Engineering
01.04.2014
Springer Nature B.V 한국정밀공학회 |
Subjects | |
Online Access | Get full text |
ISSN | 2288-6206 2198-0810 |
DOI | 10.1007/s40684-014-0018-z |
Cover
Summary: | The globalization of suppliers and personalization of customers require new manufacturing strategy for environmental issues, region’s special regulation and energy besides manufacturing factors from manufacturers. In this study, green factory is defined as a manufacturing floor that reduces waste elements such as extra work, energy, time and cost through quickly responding to external uncontrollable changes like a regulation, due date and supply. Therefore, the green factory should respond by establishing and implementing strategies for controlling their production volumes, changing their dispatch rules, adjusting their work schedules, increasing and decreasing the number of their machines and workers based on their own internal data and capacities, and other measures. To achieve such objective, manufacturing companies should realize a manufacturing intelligence that can visualize their shop-floor data, and detect and solve problems at the business planning level. In this study, an agile operations management (AOM) system that can quickly respond to field problems was developed for manufacturing intelligence. The AOM system refers to a system that collects internal data, monitors such data in real time, immediately detects problems, if any, and provides solutions to the detected issues within the shortest time. |
---|---|
Bibliography: | ObjectType-Article-1 SourceType-Scholarly Journals-1 ObjectType-Feature-2 content type line 14 G704-SER000004240.2014.1.2.004 |
ISSN: | 2288-6206 2198-0810 |
DOI: | 10.1007/s40684-014-0018-z |