Effect of Time-Varying Factors on Optimal Combination of Quality Inspectors for Offline Inspection Station

With advanced manufacturing technology, organizations like to cut their operational cost and improve product quality, yet the importance of human labor is still alive in some manufacturing industries. The performance of human-based systems depends much on the skill of labor that varies person to per...

Full description

Saved in:
Bibliographic Details
Published inMathematics (Basel) Vol. 7; no. 1; p. 51
Main Authors Babar Ramzan, Muhammad, Mohsin Qureshi, Shehreyar, Irshad Mari, Sonia, Saad Memon, Muhammad, Mittal, Mandeep, Imran, Muhammad, Waqas Iqbal, Muhammad
Format Journal Article
LanguageEnglish
Published Basel MDPI AG 01.01.2019
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:With advanced manufacturing technology, organizations like to cut their operational cost and improve product quality, yet the importance of human labor is still alive in some manufacturing industries. The performance of human-based systems depends much on the skill of labor that varies person to person within available manpower. Much work has been done on human resource and management, however, allocation of manpower based on their skill yet not investigated. For this purpose, this study considered offline inspection system where inspection is performed by the human labor of varying skill levels. A multi-objective optimization model is proposed based on Time-Varying factors; inspection skill, operation time and learning behavior. Min-max goal programming technique was used to determine the efficient combination of inspectors of each skill level at different time intervals of a running order. The optimized results ensured the achievement of all objectives of inspection station: the cost associated with inspectors, outgoing quality and inspected quantity. The obtained results proved that inspection performance of inspectors improves significantly with learning and revision of allocation of inspectors with the proposed model ensure better utilization of available manpower, maintain good quality and reduce cost as well.
ISSN:2227-7390
2227-7390
DOI:10.3390/math7010051