Effective transmission constrained economic dispatch for production costing
Summary In this paper, an effective Schur complement method is presented to solve transmission‐constrained dispatch (TCD) for Monte Carlo production costing. Several techniques for improving TCD performance are also proposed by taking the advantages of TCD special problem structures. Numerical testi...
Saved in:
Published in | International journal of numerical modelling Vol. 29; no. 4; pp. 623 - 636 |
---|---|
Main Authors | , , , , |
Format | Journal Article |
Language | English |
Published |
Bognor Regis
Blackwell Publishing Ltd
01.07.2016
Wiley Subscription Services, Inc |
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | Summary
In this paper, an effective Schur complement method is presented to solve transmission‐constrained dispatch (TCD) for Monte Carlo production costing. Several techniques for improving TCD performance are also proposed by taking the advantages of TCD special problem structures. Numerical testing on a real‐life large‐scale power system is presented to illustrate the performance of these proposed methodologies. Copyright © 2015 John Wiley & Sons, Ltd. |
---|---|
Bibliography: | ArticleID:JNM2116 istex:90BA1B2F4819B45F7534156388FBEDD40399ED4C ark:/67375/WNG-GPDF1DNZ-T ObjectType-Article-1 SourceType-Scholarly Journals-1 ObjectType-Feature-2 content type line 23 |
ISSN: | 0894-3370 1099-1204 |
DOI: | 10.1002/jnm.2116 |