Performance of GFRP-RC precast cap beam to column connections with epoxy-anchored reinforcement: a numerical study

In this study, a detailed finite element investigation was conducted to evaluate the performance of glass fibre-reinforced polymer (GFRP) RC precast cap beam to column connections connected with epoxy-anchored reinforcement (epoxy duct connection). The developed model was initially validated against...

Full description

Saved in:
Bibliographic Details
Published inArchives of Civil and Mechanical Engineering Vol. 24; no. 2; p. 131
Main Authors El-Naqeeb, Mohamed H., Hassanli, Reza, Zhuge, Yan, Ma, Xing, Bazli, Milad, Manalo, Allan
Format Journal Article
LanguageEnglish
Published London Springer London 23.04.2024
Springer Nature B.V
Subjects
Online AccessGet full text
ISSN2083-3318
1644-9665
2083-3318
DOI10.1007/s43452-024-00946-1

Cover

More Information
Summary:In this study, a detailed finite element investigation was conducted to evaluate the performance of glass fibre-reinforced polymer (GFRP) RC precast cap beam to column connections connected with epoxy-anchored reinforcement (epoxy duct connection). The developed model was initially validated against three experimental results with different anchored GFRP reinforcement considering the effect of reinforcement slippage. Different interaction models for slippage simulation were evaluated and discussed. The validated model was then utilized to investigate the effect of anchored length, bar diameters, anchored reinforcement amount, and the geometry of the connection. The results indicate that an optimum anchored length, equal to 25 times the bar's diameter, should be provided. It was also found that the precast beam-to-column element connection should be designed for a moment capacity at least 25% higher than that of the column section. Moreover, a minimum beam width, depth and beam overhanging length of 1.75, 1.6 and 0.25 times the column width respectively were recommended to be considered in design. The results from this study can provide direct guidelines for the design of precast GFRP-RC cap beam to the column connection with epoxy anchored reinforcement, especially in applications where precast elements need to be erected quickly, a novel method that can accelerate the construction of jetties and bridges.
Bibliography:ObjectType-Article-1
SourceType-Scholarly Journals-1
ObjectType-Feature-2
content type line 14
ISSN:2083-3318
1644-9665
2083-3318
DOI:10.1007/s43452-024-00946-1