Physics design of CYCAIE-100
O4; The design and construction of Beijing Radioactive Ion-beam Facility(BRIF)was started at China Institute of Atomic Energy-CIAE)in 2004.In this project,a 100 MeV high intensity cyclotron,CYCIAE100,is selected as a driving accelerator for radioactive ion beam production.It will provide a proton be...
Saved in:
Published in | Chinese physics C Vol. 33; no. S2; pp. 33 - 38 |
---|---|
Main Authors | , , , , , , , , , , , |
Format | Journal Article |
Language | English |
Published |
IOP Publishing
01.06.2009
China Institute of Atomic Energy,Beijing 102413,China%China Institute of Atomic Energy,Beijing 102413,China Tsinghua University,Beijing 100084,China |
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | O4; The design and construction of Beijing Radioactive Ion-beam Facility(BRIF)was started at China Institute of Atomic Energy-CIAE)in 2004.In this project,a 100 MeV high intensity cyclotron,CYCIAE100,is selected as a driving accelerator for radioactive ion beam production.It will provide a proton beam of 75-100 MeV with an intensity of 200-500 μA.The scheme adopted in this design,i.e.,stripping the for each system has been accomplished.This paper depicts the basic physics design of the machine,including its major structure and parameters,beam dynamics and each relevant system,e.g.basic structure of the main magnet,numerical simulation of the RF resonant cavity,axial injection system,central region,and study on crucial physics problems concerning the extraction and beam lines.The major problems encountered during the design of CYCIAE-100 are also summarized in this paper. |
---|---|
ISSN: | 1674-1137 2058-6132 0254-3052 |
DOI: | 10.1088/1674-1137/33/S2/009 |