Finite Element Simulation of Excavation and Supporting of Karl Valley Quarry at Pubugou Hydropower Project

Karl Valley Quarry is the main quarry for the construction of the Pubugou Hydropower Project. With its developed faults ,veins ,dense joint-relief zones, deep pressure-relief zones and fissure, the slope has the possibility of integral and partial instability in the densely blasting and excavating p...

Full description

Saved in:
Bibliographic Details
Published inApplied Mechanics and Materials Vol. 170-173; pp. 1948 - 1953
Main Authors He, Meng Zhu, Zeng, Yi Pei, Xu, Guo Zhang
Format Journal Article
LanguageEnglish
Published Zurich Trans Tech Publications Ltd 01.01.2012
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:Karl Valley Quarry is the main quarry for the construction of the Pubugou Hydropower Project. With its developed faults ,veins ,dense joint-relief zones, deep pressure-relief zones and fissure, the slope has the possibility of integral and partial instability in the densely blasting and excavating process).Based on the rock elastic-plastic equivalent constitutive relations of joint-anchoring, by using the elastic-plastic element finite element method, the slope excavation and reinforcement as well as the stability is numerically simulated and analyzed. In addition, the reasonability of the initially drafted schemes for construction sequences and anchoring are evaluated and some valuable and instructive suggestions have been proposed to the engineering construction relevantly.
Bibliography:Selected, peer reviewed papers from the 2nd International Conference on Civil Engineering, Architecture and Building Materials (CEABM 2012), May 25-27, 2012, Yantai, China
ISBN:9783037854228
3037854227
ISSN:1660-9336
1662-7482
1662-7482
DOI:10.4028/www.scientific.net/AMM.170-173.1948