Finite Element Simulation of Excavation and Supporting of Karl Valley Quarry at Pubugou Hydropower Project
Karl Valley Quarry is the main quarry for the construction of the Pubugou Hydropower Project. With its developed faults ,veins ,dense joint-relief zones, deep pressure-relief zones and fissure, the slope has the possibility of integral and partial instability in the densely blasting and excavating p...
Saved in:
Published in | Applied Mechanics and Materials Vol. 170-173; pp. 1948 - 1953 |
---|---|
Main Authors | , , |
Format | Journal Article |
Language | English |
Published |
Zurich
Trans Tech Publications Ltd
01.01.2012
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | Karl Valley Quarry is the main quarry for the construction of the Pubugou Hydropower Project. With its developed faults ,veins ,dense joint-relief zones, deep pressure-relief zones and fissure, the slope has the possibility of integral and partial instability in the densely blasting and excavating process).Based on the rock elastic-plastic equivalent constitutive relations of joint-anchoring, by using the elastic-plastic element finite element method, the slope excavation and reinforcement as well as the stability is numerically simulated and analyzed. In addition, the reasonability of the initially drafted schemes for construction sequences and anchoring are evaluated and some valuable and instructive suggestions have been proposed to the engineering construction relevantly. |
---|---|
Bibliography: | Selected, peer reviewed papers from the 2nd International Conference on Civil Engineering, Architecture and Building Materials (CEABM 2012), May 25-27, 2012, Yantai, China |
ISBN: | 9783037854228 3037854227 |
ISSN: | 1660-9336 1662-7482 1662-7482 |
DOI: | 10.4028/www.scientific.net/AMM.170-173.1948 |