Scheduling of two-machine robotic rework cells: In-process, post-process and in-line inspection scenarios

This study focuses on the domain of a two-machine robotic cell scheduling problem under three inspection scenarios. We propose the first analytical method for minimizing the partial cycle time of cells with in-process and post-process inspection scenarios, and then we convert this cell into a multi-...

Full description

Saved in:
Bibliographic Details
Published inRobotics and autonomous systems Vol. 91; pp. 210 - 225
Main Authors Foumani, Mehdi, Smith-Miles, Kate, Gunawan, Indra
Format Journal Article
LanguageEnglish
Published Elsevier B.V 01.05.2017
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:This study focuses on the domain of a two-machine robotic cell scheduling problem under three inspection scenarios. We propose the first analytical method for minimizing the partial cycle time of cells with in-process and post-process inspection scenarios, and then we convert this cell into a multi-function robotic cell with in-line inspection scenario. For the first scenario, parts are inspected in one of the production machines using multiple sensors, while the inspection process is performed by an independent inspection machine for the second scenario. Alternatively, the inspection can be performed by a multi-function robot for the third scenario. A distinguishing characteristic of this robot is that it can perform inspection of the part in transit. However, the robot cannot complete the part transition and load it on the next destination machine if it identifies a fault in the part. The stochastic nature of the process prevents us from applying existing deterministic solution methods for corresponding scheduling problems. In the first stage, we present a heuristic method that converts a multiple-sensor inspection system into a single-sensor inspection system. The expected cycle times of two different cycles are derived based on a geometric distribution, and then the maximum expected throughput is pursued for in-process and post-process inspection sensors, respectively. In the second stage, we develop the inspection system into an in-line inspection system using a multi-function robot. Finally, we determine if it is technically feasible and profitable to replace the in-process (or post-process) inspection scenario with the in-line inspection scenario. •We study the scheduling of a two-machine robotic cell with an inspection process.•All partial cycle times are derived under three different inspection scenarios.•The maximum expected throughput is pursued for each inspection scenario.•A multiple-sensor inspection is converted into a single-sensor inspection.•We determine which inspection scenario has the highest performance.