Structure Design of Hand-Held Excavator

At present the hole digging pile is excavated in artificial by digging the hole .This method usually works in low efficiency, high labor intensity of workers and poor security situations. So through the analysis of the artificial excavating pile 's requirement, there is necessary to create a ne...

Full description

Saved in:
Bibliographic Details
Published inApplied Mechanics and Materials Vol. 405-408; pp. 3239 - 3242
Main Authors Gao, Wei Peng, Luan, Zhen Hui, Wang, Chao
Format Journal Article
LanguageEnglish
Published Zurich Trans Tech Publications Ltd 01.01.2013
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:At present the hole digging pile is excavated in artificial by digging the hole .This method usually works in low efficiency, high labor intensity of workers and poor security situations. So through the analysis of the artificial excavating pile 's requirement, there is necessary to create a new structural of a machine with the help of pneumatic conveying system to dump soil. In this paper the authors introduce a hand-held excavator which has the above structure in excavating. This machine adopted a motor as a power device, used secondary gear reducer to achieve speed-down, and drill bit was driven by the transmission shaft to complete the excavation. The machine has the digging ability of 240mm excavation pit diameter, simple structure design. It can meet one man operation requirements, and can be carried easily.
Bibliography:Selected, peer reviewed papers from the 2013 2nd International Conference on Civil, Architectural and Hydraulic Engineering (ICCAHE 2013), July 27-28, 2013, Zhuhai, China
ISBN:3037858575
9783037858578
ISSN:1660-9336
1662-7482
1662-7482
DOI:10.4028/www.scientific.net/AMM.405-408.3239