Part cost estimation at early design phase

Although 70% of part cost is determined during the early design stage, designers rarely accurately estimate the costs of their designs. Based on extensive literature review, in-depth industrial survey and close collaboration with multiple manufacturers, forty factors were identified as governing par...

Full description

Saved in:
Bibliographic Details
Published inCIRP annals Vol. 63; no. 1; pp. 153 - 156
Main Authors Molcho, Gila, Cristal, Asher, Shpitalni, Moshe
Format Journal Article
LanguageEnglish
Published Elsevier Ltd 2014
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:Although 70% of part cost is determined during the early design stage, designers rarely accurately estimate the costs of their designs. Based on extensive literature review, in-depth industrial survey and close collaboration with multiple manufacturers, forty factors were identified as governing part cost and ranked according to cost impact. Based on parameter ranking and availability at the early stages of design, a cost estimator for designers is proposed. As the design progresses and more parameters become available, a more accurate cost model is derived and proposed to manufacturers. Results are analyzed and compared to actual manufacturing costing demonstrating good fit.
Bibliography:ObjectType-Article-2
SourceType-Scholarly Journals-1
ObjectType-Feature-1
content type line 23
ISSN:0007-8506
DOI:10.1016/j.cirp.2014.03.107