On the design of control charts with guaranteed conditional performance under estimated parameters

When designing control charts the in‐control parameters are unknown, so the control limits have to be estimated using a Phase I reference sample. To evaluate the in‐control performance of control charts in the monitoring phase (Phase II), two performance indicators are most commonly used: the averag...

Full description

Saved in:
Bibliographic Details
Published inQuality and reliability engineering international Vol. 36; no. 8; pp. 2610 - 2620
Main Authors Does, Ronald J.M.M., Goedhart, Rob, Woodall, William H.
Format Journal Article
LanguageEnglish
Published Bognor Regis Wiley Subscription Services, Inc 01.12.2020
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:When designing control charts the in‐control parameters are unknown, so the control limits have to be estimated using a Phase I reference sample. To evaluate the in‐control performance of control charts in the monitoring phase (Phase II), two performance indicators are most commonly used: the average run length (ARL) or the false alarm rate (FAR). However, these quantities will vary across practitioners due to the use of different reference samples in Phase I. This variation is small only for very large amounts of Phase I data, even when the actual distribution of the data is known. In practice, we do not know the distribution of the data, and it has to be estimated, along with its parameters. This means that we have to deal with model error when parametric models are used and stochastic error because we have to estimate the parameters. With these issues in mind, choices have to be made in order to control the performance of control charts. In this paper, we discuss some results with respect to the in‐control guaranteed conditional performance of control charts with estimated parameters for parametric and nonparametric methods. We focus on Shewhart, exponentially weighted moving average (EWMA), and cumulative sum (CUSUM) control charts for monitoring the mean when parameters are estimated.
ISSN:0748-8017
1099-1638
DOI:10.1002/qre.2658