Reliability Study of Cable, Terminations, and Splices by Electric Utilities in the Northwest
The results for cable, terminations, and splice reliability are summarized from a reliability report prepared annually by the Northwest Electric Light and Power Association (NELPA). Failure rates are given for primary cable, secondary cable, plug-in elbow connectors, primary splices and loadbreak ju...
Saved in:
Published in | IEEE transactions on industry applications Vol. IA-23; no. 1; pp. 144 - 152 |
---|---|
Main Author | |
Format | Journal Article Conference Proceeding |
Language | English |
Published |
New York, NY
IEEE
01.01.1987
Institute of Electrical and Electronics Engineers |
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The results for cable, terminations, and splice reliability are summarized from a reliability report prepared annually by the Northwest Electric Light and Power Association (NELPA). Failure rates are given for primary cable, secondary cable, plug-in elbow connectors, primary splices and loadbreak junctions, pole top terminators, and secondary connections. Pertinent factors that affect the failure rates are identified. |
---|---|
ISSN: | 0093-9994 1939-9367 |
DOI: | 10.1109/TIA.1987.4504879 |