Regular scheduling measures on proportionate flowshop with job rejection

In this article, we study the method of job rejection in the setting of proportionate flowshop, and focus on minimizing regular performance measures, subject to the constraint that the total rejection cost cannot exceed a given upper bound. In particular, we study total completion time, maximum tard...

Full description

Saved in:
Bibliographic Details
Published inComputational & applied mathematics Vol. 39; no. 2
Main Authors Mor, Baruch, Shapira, Dana
Format Journal Article
LanguageEnglish
Published Cham Springer International Publishing 01.05.2020
Springer Nature B.V
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:In this article, we study the method of job rejection in the setting of proportionate flowshop, and focus on minimizing regular performance measures, subject to the constraint that the total rejection cost cannot exceed a given upper bound. In particular, we study total completion time, maximum tardiness, total tardiness, and total weighted number of tardy jobs. All the addressed problems are NP-hard as their single machine counterpart are known to be NP-hard. To the best of our knowledge, there are no detailed solutions in scheduling literature to the first two problems, whereas the last two problems were never addressed to date. For each problem, we provide a pseudo-polynomial dynamic programming solution algorithm, and furthermore, we enhance the reported running time of the first two problems. Our extensive numerical study validates the efficiency of the provided solutions.
Bibliography:ObjectType-Article-1
SourceType-Scholarly Journals-1
ObjectType-Feature-2
content type line 14
ISSN:2238-3603
1807-0302
DOI:10.1007/s40314-020-1130-z