Proposal for fiber-optic data acquisition system for Baikal-GVD

Abstract The first stage of the construction of the Baikal-GVD deep underwater neutrino telescope is planned to be completed in 2024. For the second stage of the detector deployment, a data acquisition system based on fiber-optic technologies has been proposed, which will allow for increased data th...

Full description

Saved in:
Bibliographic Details
Published inJournal of instrumentation Vol. 16; no. 11; p. C11006
Main Authors Allakhverdyan, V.A., Avrorin, A.D., Avrorin, A.V., Aynutdinov, V.M., Bannasch, R., Bardаčová, Z., Belolaptikov, I.A., Borina, I.V., Brudanin, V.B., Budnev, N.M., Dik, V.Y., Domogatsky, G.V., Doroshenko, A.A., Dvornický, R., Dyachok, A.N., Dzhilbkibaev, Zh.-A.M., Eckerová, E., Elzhov, T.V., Fajt, L., Fialkovsky, S.V., Gafarov, A.R., Golubkov, K.V., Gorshkov, N.S., Gress, T.I., Katulin, M.S., Kebkal, K.G., Kebkal, O.G., Khramov, E.V., Kolbin, M.M., Konischev, K.V., Kopański, K.A., Korobchenko, A.V., Koshechkin, A.P., Kozhin, V.A., Kruglov, M.V., Kryukov, M.K., Kulepov, V.F., Malecki, Pa, Malyshkin, Y.M., Milenin, M.B., Mirgazov, R.R., Naumov, D.V., Nazari, V., Noga, W., Petukhov, D.P., Pliskovsky, E.N., Rozanov, M.I., Rushay, V.D., Ryabov, E.V., Safronov, G.B., Shaybonov, B.A., Shelepov, M.D., Šimkovic, F., Sirenko, A.E., Skurikhin, A.V., Solovjev, A.G., Sorokovikov, M.N., Štekl, I., Stromakov, A.P., Sushenok, E.O., Suvorova, O.V., Tabolenko, V.A., Tarashansky, B.A., Yablokova, Y.V., Yakovlev, S.A., Zaborov, D.N.
Format Journal Article
LanguageEnglish
Published Bristol IOP Publishing 01.11.2021
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:Abstract The first stage of the construction of the Baikal-GVD deep underwater neutrino telescope is planned to be completed in 2024. For the second stage of the detector deployment, a data acquisition system based on fiber-optic technologies has been proposed, which will allow for increased data throughput and more flexible trigger conditions. A dedicated test facility has been built and deployed at the Baikal-GVD site to test the new technological solutions. We present the principles of operation and results of tests of the new data acquisition system.
ISSN:1748-0221
1748-0221
DOI:10.1088/1748-0221/16/11/C11006