Prediction of water inflow and analysis of surrounding rock stability in unfavorable geological mountain tunnel

During the construction of a mountain tunnel, water inflow and rock instability are common occurrences due to unfavorable geological conditions, posing serious threats to construction safety. This study focuses on a proposed mountain tunnel and employs multiple formulas to predict potential water in...

Full description

Saved in:
Bibliographic Details
Published inFrontiers in earth science (Lausanne) Vol. 12
Main Authors Chen, Yunjuan, Liu, Mengyue, Su, Mengzhen, Ding, Mingxu, Li, Haolin, Jing, Yi
Format Journal Article
LanguageEnglish
Published Frontiers Media S.A 28.02.2024
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:During the construction of a mountain tunnel, water inflow and rock instability are common occurrences due to unfavorable geological conditions, posing serious threats to construction safety. This study focuses on a proposed mountain tunnel and employs multiple formulas to predict potential water inflow during excavation. Based on the amount of water inflow and deformation of surrounding rocks, comprehensive determinations are made for the thickness of grouting rings and permeability coefficients. The results demonstrate that: 1) Different formulas yield slightly varied outcomes but overall trends remain consistent; considering various calculations, the normal water inflow for this tunnel is approximately 115.5908×10 3 m 3 /d with a maximum at 210.9100×10 3 m 3 /d 2) Increasing grouting ring thickness or decreasing permeability coefficient can effectively reduce water inflow, but the reduction range is gradually narrowed. 3) Pre-grouting curtains have an evident effect in enhancing stability; however, their effectiveness decreases with increased thickness. 4) Taking into account both safety and economic factors, it is recommended that the grouting ring thickness be set at 8 m with a permeability coefficient equaling one 100th that of surrounding rocks for this tunnel project.
ISSN:2296-6463
2296-6463
DOI:10.3389/feart.2024.1373627