Application of SCGM(1,1) Method in the Construction Monitoring and Control of Continuous Girder Bridges

This paper bases on building grey prediction model with the stress sequence of continuous beam bridge construction control section, discusses the application of the model in the construction control of the continuous beam bridge. SCGM (1, 1) dynamic model is based on test results of control cross-se...

Full description

Saved in:
Bibliographic Details
Published inApplied Mechanics and Materials Vol. 178-181; pp. 2113 - 2116
Main Authors Duan, Bao Fu, Zhai, Cheng Bo, Weng, Xian He
Format Journal Article
LanguageEnglish
Published Zurich Trans Tech Publications Ltd 01.05.2012
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:This paper bases on building grey prediction model with the stress sequence of continuous beam bridge construction control section, discusses the application of the model in the construction control of the continuous beam bridge. SCGM (1, 1) dynamic model is based on test results of control cross-sections of Nanhe Bridge have been established for prediction, on the background of the construction of Nanhe Bridge, in Jiangsu province. The example shows that the prediction precision and adaptability of the model can achieve the requirements of the engineering construction, and the feasibility and adaptability of the construction control for bridge by using this model is validated to forecast the stress value in the practical construction control for a PC continuous bridge.
Bibliography:Selected, peer reviewed papers from the 2nd International Conference on Civil Engineering, Architecture and Building Materials (CEABM 2012), May 25-27, 2012, Yantai, China
ISBN:3037854243
9783037854242
ISSN:1660-9336
1662-7482
1662-7482
DOI:10.4028/www.scientific.net/AMM.178-181.2113