Optimal Planning of Distribution System Considering Distributed Generators

This paper presents a methodology for substation optimal planning considering DG for peak shaving. Utility can take effective demand-side management (DSM) to encourage customer-owned DG to participate in peak load shaving, and it can also construct utility DG to meet the peak load demand. In this pa...

Full description

Saved in:
Bibliographic Details
Published inApplied Mechanics and Materials Vol. 291-294; pp. 2022 - 2027
Main Authors Liu, Hai Tao, Su, Jian, Liang, Hui Shi
Format Journal Article
LanguageEnglish
Published Zurich Trans Tech Publications Ltd 13.02.2013
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:This paper presents a methodology for substation optimal planning considering DG for peak shaving. Utility can take effective demand-side management (DSM) to encourage customer-owned DG to participate in peak load shaving, and it can also construct utility DG to meet the peak load demand. In this paper, the impact of DG on peak load shaving is analyzed, and DG is taken as a complement to T&D system to meet load demand, which is considered in the substation planning. Substations sizing and location and new-built utility DG capacity is optimized using Particle Swarm Optimization (PSO), in which supply area of each substation is obtained by Voronoi diagram method. Case study shows that planning result considering DG for peak shaving can defer T&D system expansion so that considerable investment can be saved. Especially for those areas with high cost of T&D system construction, constructing DG to meet peak load demand would be a more economic way.
Bibliography:Selected, peer reviewed papers from the 2012 International Conference on Sustainable Energy and Environmental Engineering (ICSEEE 2012), December 29-30, 2012, Guangzhou, China
ISBN:9783037856345
3037856343
ISSN:1660-9336
1662-7482
1662-7482
DOI:10.4028/www.scientific.net/AMM.291-294.2022