Improving the Construction of the Highway Using Rocky Material Disintegrated by Blasting

In construction practice it is often possible to replace the building material, which is planned in the design phase, by the local cheaper material. In this paper analysis of the possibility of replacing the retaining structure of reinforced earth, which is envisioned in the main design of the Highw...

Full description

Saved in:
Bibliographic Details
Published inProcedia engineering Vol. 117; pp. 452 - 458
Main Authors Davidović, Nebojša, Bonić, Zoran, Prolović, Verka, Zlatanović, Elefterija, Romić, Nikola
Format Journal Article
LanguageEnglish
Published Elsevier Ltd 2015
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:In construction practice it is often possible to replace the building material, which is planned in the design phase, by the local cheaper material. In this paper analysis of the possibility of replacing the retaining structure of reinforced earth, which is envisioned in the main design of the Highway E-80: Niš – Dimitrovgrad, by embankment of disintegrated rocky material, is presented. This material is obtained by blasting the rock mass near this location. Recommendations for changing of the main design were given based on the results of the computational slope stability analysis which was performed by the limit equilibrium method, according to Spencer's solution. Due to this change the organization of construction works is significantly improved.
ISSN:1877-7058
1877-7058
DOI:10.1016/j.proeng.2015.08.194