Perceived inefficiency in social housing maintenance

Purpose - The purpose of this paper is to identify areas of waste and inefficiency in the built asset maintenance process and to outline an alternative approach based around performance metrics, which seeks to minimise waste and produce a more sustainable, cost- effective approach to built asset mai...

Full description

Saved in:
Bibliographic Details
Published inConstruction innovation Vol. 12; no. 4; pp. 414 - 428
Main Authors Sharp, Mark, Jones, Keith
Format Journal Article
LanguageEnglish
Published London Emerald Group Publishing Limited 05.10.2012
Subjects
Online AccessGet full text
ISSN1471-4175
1477-0857
DOI10.1108/14714171211272199

Cover

Loading…
More Information
Summary:Purpose - The purpose of this paper is to identify areas of waste and inefficiency in the built asset maintenance process and to outline an alternative approach based around performance metrics, which seeks to minimise waste and produce a more sustainable, cost- effective approach to built asset maintenance.Design methodology approach - A theoretical analysis of the built asset maintenance process identified potential areas within the process that could be subject to significant waste or inefficiencies. Structured interviews with 37 property managers and two in-depth case studies of UK social landlords were used to provide greater insights into the causes of the waste inefficiencies and to develop a performance-based approach to identify built asset maintenance needs.Findings - The current approach to built asset maintenance is prone to wide ranging inefficiencies. These inefficiencies are deep rooted and resulted from an intrinsic weakness in the theoretical model underpinning built asset maintenance management. The theory assumes condition is a suitable proxy for performance. Whilst this assumption may have been valid in the past, current drivers for a sustainable future, coupled with the need to reduce costs in light of current public sector spending, requires a wider range of issues to be considered when identifying and prioritising maintenance needs. Identifying needs, planning of work and post contract inspection were perceived to be the most inefficient activities in the current approach to built asset maintenance management. These could be reduced by adopting a new approach that links performance of the built asset to key business drivers.Research limitations implications - At this stage, the new performance model is conceptual and requires further implementation to test its robustness and resilience.Practical implications - The adoption of the model will force maintenance managers to consider the implications of their maintenance actions at a strategic level that links priorities to critical success factors through targeted key performance indicators.Originality value - This paper extends the concept of performance-based approaches used in other industries to built asset maintenance and provides a practical representation of a process model by which the theory can be implemented.
Bibliography:SourceType-Scholarly Journals-1
ObjectType-Feature-1
content type line 14
ObjectType-Article-2
content type line 23
ISSN:1471-4175
1477-0857
DOI:10.1108/14714171211272199