Petri Net Modeling and Scheduling of a Close-Down Process for Time-Constrained Single-Arm Cluster Tools

In wafer fabrication, a robotic cluster tool is required to be closed down in order for engineers to perform its on-demand and preventive maintenance and switch between different wafer lots. They often deal with a close-down process subject to wafer residency time constraints, i.e., a wafer must exi...

Full description

Saved in:
Bibliographic Details
Published inIEEE transactions on systems, man, and cybernetics. Systems Vol. 48; no. 3; pp. 389 - 400
Main Authors Zhu, QingHua, Zhou, MengChu, Qiao, Yan, Wu, NaiQi
Format Journal Article
LanguageEnglish
Published New York IEEE 01.03.2018
The Institute of Electrical and Electronics Engineers, Inc. (IEEE)
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:In wafer fabrication, a robotic cluster tool is required to be closed down in order for engineers to perform its on-demand and preventive maintenance and switch between different wafer lots. They often deal with a close-down process subject to wafer residency time constraints, i.e., a wafer must exit from a processing chamber before its quality degradation within a certain time limit. To obtain higher yield, it is very important to optimize a close-down process for a cluster tool. Yet the existing literature pays no or little attention to this issue. By focusing on a time-constrained single-arm cluster tool, this paper intends: 1) to build its Petri net model to analyze its schedulability and 2) to develop computationally efficient algorithms to find an optimal and feasible schedule for its closing-down process under different workloads at its steps. Industrial examples are used to illustrate the application of the proposed method.
Bibliography:ObjectType-Article-1
SourceType-Scholarly Journals-1
ObjectType-Feature-2
content type line 14
ISSN:2168-2216
2168-2232
DOI:10.1109/TSMC.2016.2598303