Safety analysis of temporary anchorage system for immersed tube in Shenzhen–Zhongshan Link

In the construction of the Shenzhen–Zhongshan Link, a temporary anchorage system, distributed uniformly along the pipe wall, has been employed. To assess the safety and reliability of this system, a combined method utilizing numerical analysis and model experiments was applied to study the safety of...

Full description

Saved in:
Bibliographic Details
Published inJournal of Traffic and Transportation Engineering (English ed. Online) Vol. 11; no. 4; pp. 797 - 813
Main Authors Lei Yan, Jinning Yan, Guoping Xu, Shuanhai He, Zechen Zhang
Format Journal Article
LanguageEnglish
Published KeAi Communications Co., Ltd 01.08.2024
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:In the construction of the Shenzhen–Zhongshan Link, a temporary anchorage system, distributed uniformly along the pipe wall, has been employed. To assess the safety and reliability of this system, a combined method utilizing numerical analysis and model experiments was applied to study the safety of the temporary anchorage system and the reliability of the tension rods. Firstly, an overall model of the caisson segment based on GINA rebound force was established to analyze the stress state of the entire system. Secondly, a comprehensive numerical analysis and model experiment verification were conducted for the single tensioning system, revealing its failure mode and safety margin. The results indicate that the tension rod systems are uniformly stressed at an average of 444 kN during underwater jointing, with a safety factor of 1.94. At this point, the maximum von Mises stresses appearing at the front plate corners and the lower edge of the U-groove, with stress values of 181.8 MPa and 172.4 MPa, and safety factors of 1.54 and 1.71, respectively. When the tension rod force reaches 940 kN, the tensioning system reaches its bearing limit, with initial yielding occurring at the front plate corners. Model experiments were conducted to verify the theoretical analysis results, under a test load of 444 kN, the stresses at the front plate corners and the lower edge of the U-groove were 159.6 and 195.9 MPa, respectively. As the test load increased to 940 kN, these stresses reached 390 and 389 MPa, exhibiting good agreement with the numerical analysis. Considering the uncertainty of loads and materials, a reliability analysis of the tension rods was conducted, yielding a reliability index of 4.34, meeting the secondary safety standard. Based on the comprehensive analysis, it can be concluded that the temporary anchorage system in the caisson segments of the Shenzhen–Zhongshan Link exhibits excellent safety margins.
ISSN:2095-7564
DOI:10.1016/j.jtte.2024.04.002