Optimal Inspection and Replacement Strategy for Systems Subject to Two Types of Failures with Adjustable Inspection Intervals
The inspection activities are often carried out to detect possible indication of failures in plant systems.This paper considers a single unit system subject to two types of failures, where one failure mode is the traditional0-1 logic failure and the other failure mode is described by a two-stage fai...
Saved in:
Published in | Shanghai jiao tong da xue xue bao Vol. 22; no. 6; pp. 752 - 755 |
---|---|
Main Author | |
Format | Journal Article |
Language | English |
Published |
Shanghai
Shanghai Jiaotong University Press
01.12.2017
Springer Nature B.V |
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The inspection activities are often carried out to detect possible indication of failures in plant systems.This paper considers a single unit system subject to two types of failures, where one failure mode is the traditional0-1 logic failure and the other failure mode is described by a two-stage failure process. Adjustable inspections are used to detect the defective stage of the latter. We assume that the inspection duration gets shorter and shorter with a constant ratio. At the same time, preventive replacement is used to avoid the possible failure due to the former failure mode. The renewal process of this system is analyzed and the expected long-run cost per unit time(ELRCUT) is derived. The optimal inspection period and the preventive replacement interval to minimize ELRCUT are studied. At last, a numerical example is presented to illustrate the proposed model. |
---|---|
Bibliography: | 31-1943/U MA Xiaoyang;WANG Wenbin;LIU Xuejuan;PENG Rui;Department of Management Science and Engineering,University of Science and Technology Beijing;Faculty of Business and Law,Manchester Metropolitan University ObjectType-Article-1 SourceType-Scholarly Journals-1 ObjectType-Feature-2 content type line 14 |
ISSN: | 1007-1172 1995-8188 |
DOI: | 10.1007/s12204-017-1896-3 |