Commissioning of the 28-GHz Electron Cyclotron Resonance Heating System on ADITYA Tokamak

An electron cyclotron resonance heating system is commissioned on Aditya tokamak to carry out pre-ionization, start-up, and heating experiments. A high-power microwave source (gyrotron), capable of delivering 200-kW cw power at 28 ± 0.1 GHz, is commissioned successfully using a water dummy load for...

Full description

Saved in:
Bibliographic Details
Published inFusion science and technology Vol. 50; no. 4; pp. 551 - 560
Main Authors Shukla, B. K., Sathyanarayana, K., Bora, D., Kulkarni, Sanjay V., Gangopadhyay, Sampa, Srinivas, Y. S. S., Khilar, P. L., Kushwah, Mahesh, Trivedi, R. G., Rajashree, S., Pal, Barnali, Bhardwaj, Anil, Rathi, D., Kadia, B. R., Patel, Ashish, Virani, Chetan, Patel, Harsida, Jadav, H. M., Parmar, K. G., Shah, P., Makwana, A. R., Dani, Sunil, Kirit, P., Harsha, M., Soni, J.
Format Journal Article
LanguageEnglish
Published Taylor & Francis 01.11.2006
Online AccessGet full text

Cover

Loading…
More Information
Summary:An electron cyclotron resonance heating system is commissioned on Aditya tokamak to carry out pre-ionization, start-up, and heating experiments. A high-power microwave source (gyrotron), capable of delivering 200-kW cw power at 28 ± 0.1 GHz, is commissioned successfully using a water dummy load for pulsed operation. The output mode of the gyrotron is TE 02 . The output power of the gyrotron is measured using microwave probe couplers, a spectrum analyzer, and calorimetric techniques. A hardwired interlock operates a rail-gap-based crowbar system in less than 10 μs under fault condition and protects the gyrotron. The rail-gap crowbar operation has been qualified with the high-voltage power supply by performing a 10-J wire-burn test prior to energizing the gyrotron. A transmission line consisting of matching optic units, dc break, polarizer, miter bend, and corrugated waveguides terminates with a boron nitride window. The total attenuation in the line is measured to be less than 1.1 dB. Based on quasi-optical theory, a beam launcher is designed, fabricated, and tested for ultrahigh-vacuum compatibility prior to commissioning on tokamak. After successful operation of the gyrotron on the dummy load, the gyrotron output has been coupled to the ADITYA tokamak, and successful breakdown of neutral gas is observed without assistance from an ohmic transformer.
Bibliography:ObjectType-Article-2
SourceType-Scholarly Journals-1
ObjectType-Feature-1
content type line 23
ISSN:1536-1055
1943-7641
DOI:10.13182/FST06-A1279