Gain-Scheduled Equivalent-Cascade IMC Tuning Method for Water Level Control System of Nuclear Steam Generator

In this paper, a gain-scheduled equivalent-cascade internal-model-control (IMC) tuning method for water level control system of nuclear steam generator is presented. First, a water level control system for a steam generator is transferred into an equivalent cascade-feedforward control system. Second...

Full description

Saved in:
Bibliographic Details
Published inProcesses Vol. 8; no. 9; p. 1160
Main Authors Xu, Zuhua, Fan, Qingli, Zhao, Jun
Format Journal Article
LanguageEnglish
Published 01.09.2020
Online AccessGet full text

Cover

Loading…
More Information
Summary:In this paper, a gain-scheduled equivalent-cascade internal-model-control (IMC) tuning method for water level control system of nuclear steam generator is presented. First, a water level control system for a steam generator is transferred into an equivalent cascade-feedforward control system. Second, analytical tuning rules for the equivalent cascade control system are derived based on the IMC-(proportional-integral-derivative) PID method, which can simultaneously tune the primary/secondary loops and avoid the re-identification step. Finally, gain scheduling is performed to eliminate the influence of process nonlinearity. The experimental results of nuclear simulation platform have demonstrated the superiority of the proposed tuning method.
ISSN:2227-9717
2227-9717
DOI:10.3390/pr8091160