Operation strategy optimization for on-orbit satellite subsystems considering multiple active switching
•An operation strategy optimization for on-orbit satellite subsystems is established based on multiple active switching.•A BDD-based method is used to model the reliability of the warm standby system.•The cases of non-periodic switching and imperfect switching process are considered.•The analytic ex...
Saved in:
Published in | Reliability engineering & system safety Vol. 215; p. 107765 |
---|---|
Main Authors | , , , |
Format | Journal Article |
Language | English |
Published |
Barking
Elsevier Ltd
01.11.2021
Elsevier BV |
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | •An operation strategy optimization for on-orbit satellite subsystems is established based on multiple active switching.•A BDD-based method is used to model the reliability of the warm standby system.•The cases of non-periodic switching and imperfect switching process are considered.•The analytic expression for the reliability function and MTTF of the warm standby subsystem are derived.•The active switching numbers and corresponding time points are optimized for engineering applications.
To improve the reliability of satellites, there are many standby configurations in the key subsystems. Concerning the on-orbit operation of standby systems, the standby units usually switch to the operating state after the active units fail. However, a periodic switching strategy differing from this common strategy is employed for the gyroscope warm standby system of satellite in engineering. For this problem, a multiple active switching policy for standby units is considered, and the on-orbit operation strategy optimization problem is studied. First, the multiple active switching process of the gyroscope warm standby system and the virtual age theory are described. Second, under the imperfect and non-periodic multiple active switching strategy, the reliability function and mean time to failure (MTTF) of the warm standby system are derived based on the binary decision diagram (BDD) with units following arbitrary lifetime distributions. Furthermore, an operation optimization model is proposed by maximizing the MTTF of the warm standby system to obtain the optimal switching numbers and corresponding time points. Finally, a numerical example of the gyroscope warm standby system under the Weibull distribution is presented to show the application of the model, and a sensitivity analysis is carried out to identify the useful conclusions. |
---|---|
Bibliography: | ObjectType-Article-1 SourceType-Scholarly Journals-1 ObjectType-Feature-2 content type line 14 |
ISSN: | 0951-8320 1879-0836 |
DOI: | 10.1016/j.ress.2021.107765 |