Step-by-step cyclic processes scheduling
Automated Guided Vehicles (AGVs) fleet scheduling is one of the big problems in Flexible Manufacturing System (FMS) control. The problem is more complicated when concurrent multi-product manufacturing and resource deadlock avoidance policies are considered. The objective of the research is to provid...
Saved in:
Published in | IFAC Proceedings Volumes Vol. 46; no. 7; pp. 300 - 305 |
---|---|
Main Authors | , , |
Format | Journal Article |
Language | English |
Published |
01.05.2013
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | Automated Guided Vehicles (AGVs) fleet scheduling is one of the big problems in Flexible Manufacturing System (FMS) control. The problem is more complicated when concurrent multi-product manufacturing and resource deadlock avoidance policies are considered. The objective of the research is to provide a declarative model enabling to state a constraint satisfaction problem aimed at AGVs fleet scheduling subject to assumed itineraries of concurrently manufactured product types. In other words, assuming a given layout of FMS's material handling and production routes of simultaneously manufactured orders, the main objective is to provide the declarative framework aimed at conditions allowing one to calculate the AGVs fleet schedule in online mode. An illustrative example of the relevant algebra-like driven step-by-stem cyclic scheduling is provided. |
---|---|
ISSN: | 1474-6670 |
DOI: | 10.3182/20130522-3-BR-4036.00096 |