Blackstart Utilization of Remote Combustion Turbines, Analytical Analysis and Field Test
This paper illustrates that some special operating procedures may be needed to blackstart a generating station from a remote combustion turbine generator. A method is presented to determine what, if any, special procedures are needed for a specific case. The results of a blackstart field test on an...
Saved in:
Published in | IEEE power engineering review Vol. PER-4; no. 8; pp. 56 - 57 |
---|---|
Main Authors | , |
Format | Journal Article |
Language | English |
Published |
IEEE
01.08.1984
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | This paper illustrates that some special operating procedures may be needed to blackstart a generating station from a remote combustion turbine generator. A method is presented to determine what, if any, special procedures are needed for a specific case. The results of a blackstart field test on an actual system are then compared to the analytical analysis. |
---|---|
ISSN: | 0272-1724 1558-1705 |
DOI: | 10.1109/MPER.1984.5525971 |