An efficient time algorithm for makespan objectives

This paper focuses on a single machine scheduling subject to machine deterioration with rate-modifying activities (RMA). The motivation for this study stems from the automatic-production line problem with one machine. The main question is to find the sequence in which jobs should be scheduled, how m...

Full description

Saved in:
Bibliographic Details
Published inAn international journal of optimization and control Vol. 5; no. 2; pp. 75 - 80
Main Author Ozturkoglu, Yucel
Format Journal Article
LanguageEnglish
Published Balikesir Balikesir University, Faculty of Engineering Department of Industrial Engineering 01.01.2015
Subjects
Online AccessGet full text
ISSN2146-0957
2146-5703
DOI10.11121/ijocta.01.2015.00260

Cover

Loading…