An efficient time algorithm for makespan objectives
This paper focuses on a single machine scheduling subject to machine deterioration with rate-modifying activities (RMA). The motivation for this study stems from the automatic-production line problem with one machine. The main question is to find the sequence in which jobs should be scheduled, how m...
Saved in:
Published in | An international journal of optimization and control Vol. 5; no. 2; pp. 75 - 80 |
---|---|
Main Author | |
Format | Journal Article |
Language | English |
Published |
Balikesir
Balikesir University, Faculty of Engineering Department of Industrial Engineering
01.01.2015
|
Subjects | |
Online Access | Get full text |
ISSN | 2146-0957 2146-5703 |
DOI | 10.11121/ijocta.01.2015.00260 |
Cover
Loading…