An efficient time algorithm for makespan objectives
This paper focuses on a single machine scheduling subject to machine deterioration with rate-modifying activities (RMA). The motivation for this study stems from the automatic-production line problem with one machine. The main question is to find the sequence in which jobs should be scheduled, how m...
Saved in:
Published in | An international journal of optimization and control Vol. 5; no. 2; pp. 75 - 80 |
---|---|
Main Author | |
Format | Journal Article |
Language | English |
Published |
Balikesir
Balikesir University, Faculty of Engineering Department of Industrial Engineering
01.01.2015
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | This paper focuses on a single machine scheduling subject to machine deterioration with rate-modifying activities (RMA). The motivation for this study stems from the automatic-production line problem with one machine. The main question is to find the sequence in which jobs should be scheduled, how many maintenance activity (RMA) to use, if any, and where to insert them in the schedule during the time interval with optimal makespan objective. This problem is known to be NP-hard and we give concise analyses of the problem and provide polynomial time algorithms to solve the makespan problem. We also propose an algorithm which can be applied to some scheduling problems with the actual processing time of job nonlinearly based on its position.This paper focuses on a single machine scheduling subject to machine deterioration with rate-modifying activities (RMA). The motivation for this study stems from the automatic-production line problem with one machine. The main question is to find the sequence in which jobs should be scheduled, how many maintenance activity (RMA) to use, if any, and where to insert them in the schedule during the time interval with optimal makespan objective. This problem is known to be NP-hard and we give concise analyses of the problem and provide polynomial time algorithms to solve the makespan problem. We also propose an algorithm which can be applied to some scheduling problems with the actual processing time of job nonlinearly based on its position. |
---|---|
Bibliography: | SourceType-Scholarly Journals-1 ObjectType-Feature-1 content type line 14 ObjectType-Article-1 ObjectType-Feature-2 content type line 23 |
ISSN: | 2146-0957 2146-5703 |
DOI: | 10.11121/ijocta.01.2015.00260 |