EXPERIMENTAL STUDY ON STABILITY OF ARMOR STONES OF COMPOSITE MOUND
The relaxation of the construction criterion for leveling of armor stones in mound is expected to reduce the construction cost of a composite breakwater in Ise Bay. The “stability” of armor stones in the “non-leveling” and “heaping up” construction methods is studied in a hydraulic experiment. The r...
Saved in:
Published in | PROCEEDINGS OF CIVIL ENGINEERING IN THE OCEAN Vol. 15; pp. 59 - 64 |
---|---|
Main Authors | , , , |
Format | Journal Article |
Language | English |
Published |
Japan Society of Civil Engineers
1999
|
Subjects | |
Online Access | Get full text |
ISSN | 0912-7348 1884-8265 |
DOI | 10.2208/prooe.15.59 |
Cover
Summary: | The relaxation of the construction criterion for leveling of armor stones in mound is expected to reduce the construction cost of a composite breakwater in Ise Bay. The “stability” of armor stones in the “non-leveling” and “heaping up” construction methods is studied in a hydraulic experiment. The result for these cases is compared with that for the general leveling. Additionally, the diagram giving the critical depth for an allowable damage rate of approximately 1% in the non-leveling method is proposed. |
---|---|
ISSN: | 0912-7348 1884-8265 |
DOI: | 10.2208/prooe.15.59 |