Floor defects in quarters over railway tunnel caused by design and construction errors

The main subject of this paper is a floor in the quarters located above the railway tunnel in the large-area Shopping Center. The considered floor did not meet the satisfactory safety conditions, as a result of design and construction errors, which were a direct cause of the failure. In the long ter...

Full description

Saved in:
Bibliographic Details
Published inMATEC Web of Conferences Vol. 284; p. 4005
Main Authors Majewski, Tomasz, Niedostatkiewicz, Maciej, Ziółkowski, Patryk
Format Journal Article Conference Proceeding
LanguageEnglish
Published Les Ulis EDP Sciences 2019
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The main subject of this paper is a floor in the quarters located above the railway tunnel in the large-area Shopping Center. The considered floor did not meet the satisfactory safety conditions, as a result of design and construction errors, which were a direct cause of the failure. In the long term, failure could lead to a construction disaster.