Reliability Allocation of Large Mining Excavator Electrical System Based on the Entropy Method with Failure and Maintenance Data
In the design of large mining excavator electrical system,a practical reliability allocation method was introduced to allocate system level reliability requirements into subsystem and component levels. During the reliability allocation process,factors from the fault and maintenance data were only co...
Saved in:
Published in | 东华大学学报(英文版) Vol. 31; no. 6; pp. 779 - 781 |
---|---|
Main Author | |
Format | Journal Article |
Language | English |
Published |
School of Mechanical Electronic and Industrial Engineering, University of Electronic Science and Technology of China, Chengdu 611731, China%Taiyuan Heavy Industry Co., Ltd., Taiyuan 030024, China
31.12.2014
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | In the design of large mining excavator electrical system,a practical reliability allocation method was introduced to allocate system level reliability requirements into subsystem and component levels. During the reliability allocation process,factors from the fault and maintenance data were only considered in reliability allocation scheme. It could avoid the disturbance from expert experiences. The entropy method was also used to obtain weights of reliability allocation indexes of large mining excavators considering different factors. Then the failure rate allocation of subsystems and components could be completed. |
---|---|
Bibliography: | reliability allocation large mining excavators the entropy method 31-1920/N HU Tian-song, HUANG Hong-zhong, WANG Xiao-ming, LI Guang, GAO Su-he 1 School of Mechanical Electronic and Industrial Engineering, University of Electronic Science and Technology of China, Chengdu 611731, China 2 Taiyuan Heavy Industry Co. , Ltd. , Taiyuan 030024, China In the design of large mining excavator electrical system,a practical reliability allocation method was introduced to allocate system level reliability requirements into subsystem and component levels. During the reliability allocation process,factors from the fault and maintenance data were only considered in reliability allocation scheme. It could avoid the disturbance from expert experiences. The entropy method was also used to obtain weights of reliability allocation indexes of large mining excavators considering different factors. Then the failure rate allocation of subsystems and components could be completed. |
ISSN: | 1672-5220 |