The Supplying Chain Scheduling with the Cost Constraint and Subcontracting
We propose an analytical scheduling model with subcontracting. Each job can be processed either on a single machine at a manufacturer or outsourced to a subcontractor, possibly at a higher cost. For a given set of jobs, the decisions the manufacturer needs to make include the selection of a subset o...
Saved in:
Published in | Advances in Operations Research Vol. 2014; no. 2014; pp. 90 - 93 |
---|---|
Main Authors | , |
Format | Journal Article |
Language | English |
Published |
Cairo, Egypt
Hindawi Limiteds
01.01.2014
Hindawi Publishing Corporation John Wiley & Sons, Inc |
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | We propose an analytical scheduling model with subcontracting. Each job can be processed either on a single machine at a manufacturer or outsourced to a subcontractor, possibly at a higher cost. For a given set of jobs, the decisions the manufacturer needs to make include the selection of a subset of jobs to be outsourced and the schedule of all the jobs. The objective functions are to minimize the commonly used scheduling measures, subject to a constraint on the total production and subcontracting cost. We show the NP-hardiness for the problems with different objective functions and develop dynamic programming algorithms for solving them. |
---|---|
Bibliography: | ObjectType-Article-1 SourceType-Scholarly Journals-1 ObjectType-Feature-2 content type line 14 content type line 23 |
ISSN: | 1687-9147 1687-9155 |
DOI: | 10.1155/2014/490987 |