Present status of the Ogachi HDR Project, Japan, and future plans
CRIEPI initiated the Ogachi project in the northern part of Japan in 1986, to determine the feasibility of an HDR geothermal power plant based on a multi-layer reservoir. During the past eleven years technologies have been developed for surveying underground resources, forming multi-layer reservoirs...
Saved in:
Published in | Geothermics Vol. 28; no. 4; pp. 637 - 645 |
---|---|
Main Authors | , , , |
Format | Journal Article |
Language | English |
Published |
Elsevier Ltd
01.01.1999
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | CRIEPI initiated the Ogachi project in the northern part of Japan in 1986, to determine the feasibility of an HDR geothermal power plant based on a multi-layer reservoir. During the past eleven years technologies have been developed for surveying underground resources, forming multi-layer reservoirs and evaluating these reservoirs in a 1.4 billion yen study. Future plans include the development of a lifespan evaluation method, the improvement of production rates and finally, the establishment of an actual HDR power plant. |
---|---|
Bibliography: | ObjectType-Article-2 SourceType-Scholarly Journals-1 ObjectType-Feature-1 content type line 23 |
ISSN: | 0375-6505 1879-3576 |
DOI: | 10.1016/S0375-6505(99)00034-6 |