Effects of a regional channel stabilization project on suspended sediment yield
Under legislation passed in 1984, three federal agencies constructed more than $300 million worth of channel erosion control measures in 16 watersheds in northern Mississippi between 1985 and 2003. Most work was completed between 1985 and 1995 and was confined to six larger watersheds. Flows of wate...
Saved in:
Published in | Journal of soil and water conservation Vol. 63; no. 2; pp. 59 - 69 |
---|---|
Main Author | |
Format | Journal Article |
Language | English |
Published |
Ankeny, IA
Soil and Water Conservation Society
01.03.2008
Soil & Water Conservation Society |
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | Under legislation passed in 1984, three federal agencies constructed more than $300 million worth of channel erosion control
measures in 16 watersheds in northern Mississippi between 1985 and 2003. Most work was completed between 1985 and 1995 and
was confined to six larger watersheds. Flows of water and suspended sediment emanating from these watersheds were measured
from 1986 until 1997 and for longer periods for two of these gages and one additional gage. Statistical analyses of flow-adjusted
instantaneous measured concentration data failed to detect significant trends at six of the seven gages. A downward trend
was noted for a watershed in which eight reservoirs were constructed. These results indicate that watershed-level effects
of even large-scale erosion control measures are difficult to detect over 5 to 15 years. Evidently substantial reductions
in sediment yields require changes in watershed hydrology that reduce runoff and peak flows or changes in channel bed slope. |
---|---|
Bibliography: | http://hdl.handle.net/10113/21722 ObjectType-Article-2 SourceType-Scholarly Journals-1 ObjectType-Feature-1 content type line 23 |
ISSN: | 0022-4561 1941-3300 1941-3300 |
DOI: | 10.2489/jswc.63.2.59 |