Numerical analysis of underground space and pillar design in metalliferous mine
The basic principle of the room and pillar design is to create an economical and safe underground working environment by leaving as little ore as possible due to the increase in costs today. However, it is a very complex engineering issue to determine the economic pillar size that will ensure the st...
Saved in:
Published in | Journal of African earth sciences (1994) Vol. 134; pp. 365 - 372 |
---|---|
Main Authors | , , , |
Format | Journal Article |
Language | English |
Published |
Elsevier Ltd
01.10.2017
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The basic principle of the room and pillar design is to create an economical and safe underground working environment by leaving as little ore as possible due to the increase in costs today. However, it is a very complex engineering issue to determine the economic pillar size that will ensure the stability of the mine during production operations and work safety. The design of the pillar is based on the production of pillar sizes allowed up to the deformation limits without creating pillar defects and the production of as much valuable ore as possible. In this context, as the ore production is made, the vertical stresses that make up the pillar are increasing and pillar safety is at risk.
In this study, a model is made for the Bayındır lead-zinc mine, which is working with room and pillar method and is about to be completed. In the model, pillar stresses are evaluated at four different stages. In stage 1, stress values are calculated on the pillar to be between 0.89 and 0.92 MPa. In stage 2, it is computed to be between 0.81 and 0.84 and in stage 3, it is found to be between 0.33 and 0.66 MPa. As a result of the model according to these stress values, it is predicted that the pillars can be fully recovered safely.
[Display omitted]
•A numerical model study is carried out based on rock mechanics tests.•Stress distributions in pillars and surrounding of pillars are calculated in 4 distinct models and 3 stages.•It is predicted that the pillars can be fully recovered safely as a result of the model work. |
---|---|
ISSN: | 1464-343X 1879-1956 |
DOI: | 10.1016/j.jafrearsci.2017.07.018 |