An exploration of the controls of pre-instrumental streamflow using multiple tree-ring proxies

Previous studies have used tree-ring chronologies from several species to develop reconstructions of precipitation, temperature, streamflow and glacier mass balance for sites in Banff National Park, Alberta. This study examines the variability in a >300-year summer streamflow reconstruction for t...

Full description

Saved in:
Bibliographic Details
Published inDendrochronologia (Verona) Vol. 22; no. 3; pp. 225 - 234
Main Authors Watson, Emma, Luckman, Brian H.
Format Journal Article
LanguageEnglish
Published Elsevier GmbH 01.09.2005
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:Previous studies have used tree-ring chronologies from several species to develop reconstructions of precipitation, temperature, streamflow and glacier mass balance for sites in Banff National Park, Alberta. This study examines the variability in a >300-year summer streamflow reconstruction for the Bow River at Banff in conjunction with changes in the major contributors to streamflow (glacier melt, winter and summer pecipitation). Reconstructed winter mass balance for Peyto Glacier is used as a surrogate for winter precipitation and April–August precipitation is reconstructed for Banff. Streamflow variability correlates most highly with winter precipitation and periods of high flow follow above average snowfall in the previous winter (high winter balance) and in some cases also with above normal summer precipitation. A clear response to changes in summer mass balance at Peyto Glacier (i.e. summer glacier melting) cannot be identified in this summer discharge record. Problems developing physically realistic flow reconstructions for snowmelt dominated rivers from summer sensitive tree-ring chronologies are also discussed.
Bibliography:ObjectType-Article-1
SourceType-Scholarly Journals-1
ObjectType-Feature-2
content type line 23
ISSN:1125-7865
1612-0051
DOI:10.1016/j.dendro.2005.05.006