Tip Post-Grouting of Slurry-Drilled Shafts in Soil: Chinese Experiences
Some Chinese experiences are summarized and evaluated for tip post-grouting of drilled shafts constructed in soil using mud slurry. The factors that affect tip post-grouting are discussed, including many grout issues. Capacity increase is discussed, and some empirical Chinese criteria are cited for...
Saved in:
Published in | Contemporary Topics in Deep Foundations pp. 47 - 54 |
---|---|
Main Authors | , |
Format | Book Chapter |
Language | English |
Published |
American Society of Civil Engineers (ASCE)
2009
|
Subjects | |
Online Access | Get full text |
ISBN | 0784410216 9780784410219 |
DOI | 10.1061/41021(335)6 |
Cover
Loading…
Summary: | Some Chinese experiences are summarized and evaluated for tip post-grouting of drilled shafts constructed in soil using mud slurry. The factors that affect tip post-grouting are discussed, including many grout issues. Capacity increase is discussed, and some empirical Chinese criteria are cited for increasing the capacity. |
---|---|
ISBN: | 0784410216 9780784410219 |
DOI: | 10.1061/41021(335)6 |